Water, drainage, electricity and communications: checking villa infrastructure

Distinguish infrastructure nearby, permission to connect and sufficient capacity. Describe the proposed use and equipment when asking providers about water, drainage, power and connectivity.

KODACHI DEVELOPMENT Editorial Team
Published and sources checked: 9 November 2026

A framework for the decision

  1. 01Equipment and use
  2. 02Provider responses
  3. 03Works and operating costs

Editorial diagram. Confirm the sequence and responsibilities for the individual project.

01 / INSIGHT

Check supply and discharge together

Record mains, connection routes, capacity and who pays for works. Separately confirm sewer or treatment arrangements and rainwater discharge. Miyakojima’s guidance illustrates that groundwater review and supply coordination may both apply; do not transfer one location’s answers to another.

02 / INSIGHT

Assess simultaneous electrical demand

List air conditioning, hot water, cooking and pool pumps. Ask the installer and supplier about capacity, wiring and works. Identify water pumps and locks that would also stop in an outage. Provider and specialist responses are needed for the actual installation.

03 / INSIGHT

Test management and guest communications

Remote locks and operational communications have different needs from guest video meetings. An area coverage map does not guarantee indoor speed or reliability. Confirm installation conditions and make a usable access and communication plan for outages.

Before the consultation

ItemWhat to establish
WaterSupply, discharge, connection works and upkeep.
PowerEquipment demand, capacity and outage consequences.
NetworkAvailability, indoor performance and fallback procedures.